Construction of Hihghway Third Lane Widening spread over a length of 12km. The scope of works consists of earthworks, drainages, extension of VBC, pavement, road furniture, and fiberoptic cable laying.
Project full name
North – South Expressway Proposed Third Lane Widening Between Rawang and Tanjung Malim Package 3B (KM411.96 to KM399.94).